Rail
Emergency Response

With a 24/7/365 emergency response facility, the Griffith team is always ready.

During recent storms, Griffiths provided plant and resource to the emergency repair works for Network Rail at Mostyn in under 24 hours. The storms, combined with the high tide and low air pressure, caused significant damage to Mostyn Sea Wall and spread debris across the track.

When the emergency call came from Network Rail, Griffiths mobilised plant, drivers, and fitters to site at breakneck speed. With work continuing 24 hours a day, 25 plant operatives were used at peak output. Two fitters were permanently based on site supported by our in-house plant division.

CASE STUDIES

EXPLORE MORE Rail